Close Menu
Earth & BeyondEarth & Beyond

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    5 Signs of Seasonal Depression That You Might Not Clock Right Away

    Rush Add 17 Dates to ‘Fifty Something’ Reunion Tour

    Rangers manager update: Danny Rohl appointed head coach

    Facebook X (Twitter) Instagram
    Earth & BeyondEarth & Beyond
    YouTube
    Subscribe
    • Home
    • Business
    • Entertainment
    • Gaming
    • Health
    • Lifestyle
    • Sports
    • Technology
    • Trending & Viral News
    Earth & BeyondEarth & Beyond
    Subscribe
    You are at:Home»Technology»Amazon shares a ‘first look’ at new nuclear facility
    Technology

    Amazon shares a ‘first look’ at new nuclear facility

    Earth & BeyondBy Earth & BeyondOctober 17, 2025002 Mins Read
    Share Facebook Twitter Pinterest LinkedIn Tumblr Email
    Amazon shares a ‘first look’ at new nuclear facility
    Share
    Facebook Twitter LinkedIn Pinterest Email

    Amazon shared some new details about its plans to help deploy more nuclear energy across Washington State, where the company is headquartered.

    About a year ago, Amazon announced an agreement with Energy Northwest, a consortium of public utilities in Washington, to support the development of up to 12 advanced reactors by the early 2030s. Once complete, Amazon would have the right to purchase electricity from the first 320-megawatt phase of the project. The additional capacity would be open to Amazon and local utilities to use.

    What’s different about these reactors is that they’re small and modular, which is supposed to make them cheaper and easier to deploy than America’s existing fleet of nuclear power plants. Amazon shared several rendered images today of what the first plant might look like outside of Richland, Washington. Called the Cascade Advanced Energy Facility, it’ll include three sections with a combined capacity of 960 megawatts, about enough electricity to power 770,000 homes in the US. While an old-school reactor with about the same capacity might spread across more than a square mile of land, according to Amazon, Cascade is expected to take up just a few city blocks.

    Amazon’s blog post today says that the Cascade facility should create about 100 permanent jobs, as well as more than 1,000 construction jobs. Considering these next-generation reactors are still under development and have to go through a licensing process, construction isn’t expected to start until the end of the decade.

    Amazon facility nuclear Shares
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Previous ArticleRecent Fedspeak Confirms Intentions for Rate Cuts to Contiue: BofA
    Next Article Bolton pleads not guilty to charges of sharing classified information
    Earth & Beyond
    • Website

    Related Posts

    Last-minute ticket deal for Disrupt 2025: Save 60% on your +1

    October 20, 2025

    Global health is in crisis — who will step in to fix it?

    October 20, 2025

    Scenes From Saturday’s Nationwide ‘No Kings’ Protests

    October 20, 2025
    Leave A Reply Cancel Reply

    Latest Post

    If you do 5 things, you’re more indecisive than most—what to do instead

    UK ministers launch investigation into blaze that shut Heathrow

    The SEC Resets Its Crypto Relationship

    How MLB plans to grow Ohtani, Dodger fandom in Japan into billions for league

    Stay In Touch
    • YouTube
    Latest Reviews

    Last-minute ticket deal for Disrupt 2025: Save 60% on your +1

    By Earth & BeyondOctober 20, 2025

    Global health is in crisis — who will step in to fix it?

    By Earth & BeyondOctober 20, 2025

    Scenes From Saturday’s Nationwide ‘No Kings’ Protests

    By Earth & BeyondOctober 20, 2025

    Subscribe to Updates

    Get the latest tech news from FooBar about tech, design and biz.

    Most Popular

    Bitcoin in the bush – crypto mining brings power to rural areas

    March 25, 202513 Views

    Israeli Police Question Palestinian Director Hamdan Ballal After West Bank Incident

    March 25, 20258 Views

    How to print D&D’s new gold dragon at home

    March 25, 20257 Views
    Our Picks

    5 Signs of Seasonal Depression That You Might Not Clock Right Away

    Rush Add 17 Dates to ‘Fifty Something’ Reunion Tour

    Rangers manager update: Danny Rohl appointed head coach

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    © 2025 Earth & Beyond.
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms and Conditions
    • Disclaimer

    Type above and press Enter to search. Press Esc to cancel.

    Newsletter Signup

    Subscribe to our weekly newsletter below and never miss the latest product or an exclusive offer.

    Enter your email address

    Thanks, I’m not interested