Close Menu
Earth & BeyondEarth & Beyond

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    Watch Mumford & Sons Perform ‘Rubber Band Man,’ ‘Here’

    Sarina Wiegman: How do Lionesses solve full-back succession problem?

    Midnight release time in your time zone

    Facebook X (Twitter) Instagram
    Earth & BeyondEarth & Beyond
    YouTube
    Subscribe
    • Home
    • Business
    • Entertainment
    • Gaming
    • Health
    • Lifestyle
    • Sports
    • Technology
    • Trending & Viral News
    Earth & BeyondEarth & Beyond
    Subscribe
    You are at:Home»Technology»NASA Adds Mission to Artemis Lunar Program, Updates Architecture  
    Technology

    NASA Adds Mission to Artemis Lunar Program, Updates Architecture  

    Earth & BeyondBy Earth & BeyondMarch 1, 2026005 Mins Read
    Share Facebook Twitter Pinterest LinkedIn Tumblr Email
    NASA Adds Mission to Artemis Lunar Program, Updates Architecture  
    Share
    Facebook Twitter LinkedIn Pinterest Email

    As part of a Golden Age of exploration and discovery, NASA announced Friday the agency is increasing its cadence of missions under the Artemis program to achieve the national objective of returning American astronauts to the Moon and establishing an enduring presence. This includes standardizing vehicle configuration, adding an additional mission in 2027, and undertaking at least one surface landing every year thereafter.

    As teams prepare to launch Artemis II in the weeks ahead, the Artemis III mission, now in 2027, will be designed to test out systems and operational capabilities in low Earth orbit to prepare for an Artemis IV landing in 2028. This new mission will endeavor to include a rendezvous and docking with one or both commercial landers from SpaceX and Blue Origin, in-space tests of the docked vehicles, integrated checkout of life support, communications, and propulsion systems, as well as tests of the new Extravehicular Activity (xEVA) suits. NASA will further define this test flight after completing detailed reviews between NASA and our industry partners. The agency will share the specific objectives for the updated Artemis III mission in the near future.

    NASA’s recently announced workforce directive is a key factor in enabling this acceleration. NASA will rebuild core competencies in the civil servant workforce including more in-house and side-by-side development work with our Artemis partners, enabling a safer, more reliable, and faster launch cadence.

    “NASA must standardize its approach, increase flight rate safely, and execute on the President’s national space policy. With credible competition from our greatest geopolitical adversary increasing by the day, we need to move faster, eliminate delays, and achieve our objectives,” said NASA Administrator Jared Isaacman. “Standardizing vehicle configuration, increasing flight rate and progressing through objectives in a logical, phased approach, is how we achieved the near-impossible in 1969 and it is how we will do it again.” 

    “After successful completion of the Artemis I flight test, the upcoming Artemis II flight test, and the new, more robust test approach to Artemis III, it is needlessly complicated to alter the configuration of the SLS and Orion stack to undertake subsequent Artemis missions,” said NASA Associate Administrator Amit Kshatriya. “There is too much learning left on the table and too much development and production risk in front of us. Instead, we want to keep testing like we fly and have flown. We are looking back to the wisdom of the folks that designed Apollo. The entire sequence of Artemis flights needs to represent a step-by-step build-up of capability, with each step bringing us closer to our ability to perform the landing missions. Each step needs to be big enough to make progress, but not so big that we take unnecessary risk given previous learnings. Therefore, we want to fly the landing missions in as close to the same Earth ascent configuration as possible – this means using an upper stage and pad systems in as close to the ‘Block 1’ configuration as possible. We will work with our partners that have been developing the evolved block configuration of these systems to take proper actions to align their efforts towards this goal and announce the details of those changes once they are finalized. We will take a similar approach to in-space, landing, and surface EVA operations as well, as we evolve the mission sequence in the spirit of the Apollo mindset, which was obsessed with system reliability and crew safety as the keys to mission success.” 

    “Boeing is a proud partner to the Artemis mission and our team is honored to contribute to NASA’s vision for American space leadership,” said Steve Parker, Boeing Defense, Space & Security president and CEO. “The SLS core stage remains the world’s most powerful rocket stage, and the only one that can carry American astronauts directly to the moon and beyond in a single launch. As NASA lays out an accelerated launch schedule, our workforce and supply chain are prepared to meet the increased production needs. With a rocket designed at NASA’s Marshall Space Flight Center in Huntsville, Alabama, built at America’s rocket factory at NASA’s Michoud Assembly Facility in New Orleans, and integrated at NASA’s Kennedy Space Center in Florida, we are ready to meet the increased demand.” 

    The announcement came during a news conference at NASA Kennedy where leaders also discussed the status of the Artemis II mission. NASA rolled the SLS and Orion spacecraft to the Vehicle Assembly Building (VAB) on Feb. 25 for repairs ahead of the next launch opportunities for the test flight in April. 

    Once the Artemis II hardware was back in the VAB, teams immediately began work on the helium issue discovered on the Interim Cryogenic Propulsion Stage and prepared for several actions including replacing batteries in the flight termination system, end-to-end testing for range safety requirements, and more.

    “I’m grateful to Administrator Isaacman for taking this bold step and moving quickly to assure we have the support and resources needed to launch Artemis astronauts to the Moon every year,” said Lori Glaze, acting associate administrator for Exploration Systems Development Mission Directorate at NASA Headquarters in Washington. “Our team is up to the challenge of a successful Artemis II mission, and soon thereafter, enabling a more frequent cadence of Moon missions.” 

    For more about the Artemis campaign, visit: 

    -end-

    Bethany Stevens / Cheryl Warner
    Headquarters, Washington
    202-358-1600
    bethany.c.stevens@nasa.gov / cheryl.m.warner@nasa.gov

    AddsMission architecture Artemis Lunar NASA program updates
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Previous ArticleWhat next as majors surge 10% to recover war-driven losses
    Next Article Midnight release time in your time zone
    Earth & Beyond
    • Website

    Related Posts

    X Is Drowning in Disinformation Following US and Israel’s Attack on Iran

    March 1, 2026

    What to know about the landmark Warner Bros. Discovery sale

    February 28, 2026

    Huel tries to solve the ‘burden’ of eating

    February 28, 2026
    Leave A Reply Cancel Reply

    Latest Post

    If you do 5 things, you’re more indecisive than most—what to do instead

    UK ministers launch investigation into blaze that shut Heathrow

    The SEC Resets Its Crypto Relationship

    How MLB plans to grow Ohtani, Dodger fandom in Japan into billions for league

    Stay In Touch
    • YouTube
    Latest Reviews

    X Is Drowning in Disinformation Following US and Israel’s Attack on Iran

    By Earth & BeyondMarch 1, 2026

    What to know about the landmark Warner Bros. Discovery sale

    By Earth & BeyondFebruary 28, 2026

    Huel tries to solve the ‘burden’ of eating

    By Earth & BeyondFebruary 28, 2026

    Subscribe to Updates

    Get the latest tech news from FooBar about tech, design and biz.

    Most Popular

    Blackpink Share New Song “Jump” Amid Deadline World Tour: Watch the Video

    July 13, 202542 Views

    Bitcoin in the bush – crypto mining brings power to rural areas

    March 25, 202513 Views

    Honor of Kings breaks esports attendance Guinness World Record 

    November 10, 202511 Views
    Our Picks

    Watch Mumford & Sons Perform ‘Rubber Band Man,’ ‘Here’

    Sarina Wiegman: How do Lionesses solve full-back succession problem?

    Midnight release time in your time zone

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    © 2026 Earth & Beyond.
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms and Conditions
    • Disclaimer

    Type above and press Enter to search. Press Esc to cancel.

    Newsletter Signup

    Subscribe to our weekly newsletter below and never miss the latest product or an exclusive offer.

    Enter your email address

    Thanks, I’m not interested