Close Menu
Earth & BeyondEarth & Beyond

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    As bitcoin (BTC) price extends declines, industry figures say it’s time to buy: Crypto Daybook Americas

    Baby Keem Details New Album Ca$ino, Announces 2026 Tour

    UFC BJJ 5: Musumeci vs Montague | Two Championship Titles on the Line in Las Vegas

    Facebook X (Twitter) Instagram
    Earth & BeyondEarth & Beyond
    YouTube
    Subscribe
    • Home
    • Business
    • Entertainment
    • Gaming
    • Health
    • Lifestyle
    • Sports
    • Technology
    • Trending & Viral News
    Earth & BeyondEarth & Beyond
    Subscribe
    You are at:Home»Technology»Artemis II Flight Crew, Teams Conduct Demonstration Ahead of Launch
    Technology

    Artemis II Flight Crew, Teams Conduct Demonstration Ahead of Launch

    Earth & BeyondBy Earth & BeyondDecember 25, 2025004 Mins Read
    Share Facebook Twitter Pinterest LinkedIn Tumblr Email
    Artemis II Flight Crew, Teams Conduct Demonstration Ahead of Launch
    Share
    Facebook Twitter LinkedIn Pinterest Email

    NASA’s launch and mission teams, along with the Artemis II crew, completed a key test Dec. 20, a countdown demonstration test, ahead of the Artemis II flight around the Moon early next year. The astronauts, supported by launch and flight control teams, dressed in their launch and entry suits, boarded their spacecraft on top of its towering rocket at the agency’s Kennedy Space Center in Florida to validate their launch date timeline.

    Winding the clock down to a point just before liftoff, the rehearsal enabled NASA teams to practice the exact steps teams will take as they move toward launch of the test flight.

    Jared Isaacman

    Jared Isaacman

    NASA Administrator

    While launch teams in the firing rooms of Kennedy’s Launch Control Center ran through procedures just as they would on launch day, the Artemis II crew members – NASA astronauts Reid Wiseman, Victor Glover, and Christina Koch, and CSA (Canadian Space Agency) astronaut Jeremy Hansen – donned their Orion crew survival system spacesuits in the Astronaut Crew Quarters inside Kennedy’s Neil A. Armstrong Operations and Checkout Building.

    Once suited, the crew made the same walk taken by Gemini, Apollo, space shuttle, and Commercial Crew Program astronauts launching from Florida’s Space Coast during the last six decades. Through the suit-up room, down the hallway, and after a quick ride on an elevator, the Artemis II crew exited the building through the double doors featuring dozens of human spaceflight mission patch stickers.

    The Artemis astronaut van waited outside to take the crew members to their SLS (Space Launch System) rocket. On the actual launch day, the four astronauts will complete a 20-minute ride to Kennedy’s Launch Complex 39B ahead of liftoff. But, for the countdown test the destination was High Bay 3 of Kennedy’s Vehicle Assembly Building, where the Artemis II Moon rocket is undergoing final processing and checkouts before rolling out to the launch pad. A convoy of support vehicles, as well as Artemis II backup crew members, NASA astronaut Andre Douglas and CSA astronaut Jenni Gibbons, escorted the crew to its destination.

    After a short trip to the building, the flight crew rode the mobile launcher’s elevator up nearly 300 feet to the crew access arm and the White Room, the enclosed area where the crew enters the spacecraft. The closeout crew, whose job it is to ensure the flight crew enters the spacecraft without issue, helped the astronauts enter Orion, which they have named Integrity. The closeout team assisted the astronauts by strapping them into their seats and closed the hatch once all closeout operations were completed. With the crew secured in Orion, teams conducted suit leak and communications checks, just as they will on launch day.

    Throughout the testing, teams ran through the final 5.5 hours of launch day procedures, completing the countdown test about 30 seconds before what will be the time of liftoff on launch day. As they may encounter on launch day, teams navigated through several real-time issues, including audio communications and environmental control and life support systems closeout activities during the test. All objectives were met, and the countdown demonstration provided a valuable opportunity to conduct operations in a day-of-launch configuration to minimize first-time learnings on launch day.

    Although Artemis II teams have performed parts of the launch countdown testing previously, this test was the first full end-to-end rundown with the crew and Orion in the launch configuration. The crew will participate in additional countdown testing after the rocket arrives to the launchpad, focusing on emergency operations.

    As part of a Golden Age of innovation and exploration, the Artemis II test flight is the first crewed mission under NASA’s Artemis campaign. It is another step toward new U.S.-crewed missions on the Moon’s surface that will help the agency prepare to land American astronauts on Mars.

    Ahead Artemis Conduct crew Demonstration Flight launch Teams
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Previous ArticleMost people think these are 5 signs of chemistry—but they’re actually ‘red flags’
    Next Article Lawmaker sues to remove Trump’s name from Kennedy Center
    Earth & Beyond
    • Website

    Related Posts

    Microsoft wants to rewire data centers to save space

    February 11, 2026

    Marvel Rivals Ignite partner teams revealed

    February 11, 2026

    Dozens of researchers will move to France from US following high-profile bid to lure talent

    February 11, 2026
    Leave A Reply Cancel Reply

    Latest Post

    If you do 5 things, you’re more indecisive than most—what to do instead

    UK ministers launch investigation into blaze that shut Heathrow

    The SEC Resets Its Crypto Relationship

    How MLB plans to grow Ohtani, Dodger fandom in Japan into billions for league

    Stay In Touch
    • YouTube
    Latest Reviews

    Microsoft wants to rewire data centers to save space

    By Earth & BeyondFebruary 11, 2026

    Marvel Rivals Ignite partner teams revealed

    By Earth & BeyondFebruary 11, 2026

    Dozens of researchers will move to France from US following high-profile bid to lure talent

    By Earth & BeyondFebruary 11, 2026

    Subscribe to Updates

    Get the latest tech news from FooBar about tech, design and biz.

    Most Popular

    Blackpink Share New Song “Jump” Amid Deadline World Tour: Watch the Video

    July 13, 202538 Views

    Bitcoin in the bush – crypto mining brings power to rural areas

    March 25, 202513 Views

    Honor of Kings breaks esports attendance Guinness World Record 

    November 10, 202511 Views
    Our Picks

    As bitcoin (BTC) price extends declines, industry figures say it’s time to buy: Crypto Daybook Americas

    Baby Keem Details New Album Ca$ino, Announces 2026 Tour

    UFC BJJ 5: Musumeci vs Montague | Two Championship Titles on the Line in Las Vegas

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    © 2026 Earth & Beyond.
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms and Conditions
    • Disclaimer

    Type above and press Enter to search. Press Esc to cancel.

    Newsletter Signup

    Subscribe to our weekly newsletter below and never miss the latest product or an exclusive offer.

    Enter your email address

    Thanks, I’m not interested